BRYKER WOODS ELEMENTARY

• W 34TH ST: New sidewalk on W 34TH St. from Jefferson St. to W 35th St.

• KERBEY LN / W 34TH ST: Add curb extensions, install two curb ramps.


CASIS ELEMENTARY

• EXPOSITION BLVD: New sidewalk on Exposition Blvd. from Northwood Rd. to Hillview Rd.

• HILLVIEW RD: Fix sidewalk obstructions on Hillview Rd. from Richard Ln. to Maria Anna Rd.

• WESTOVER RD: Fix sidewalk obstructions from Westover Rd. from Hillview Rd. to Bland St.

• NORTHWOOD RD midblock between JEFFERSON ST and OAKMONT: Improve slip lane geometry.

• HILLVIEW GREEN LN / HILLVIEW RD / MARIA ANNA RD: Tighten curb radii, install two curb ramps.

• SPRING LN / WESTOVER RD: Install one curb ramp, install high visibility crosswalk.

• N MOPAC SB TO WESTOVER RAMP / WESTOVER RD / WESTOVER TO MOPAC SB RAMP: Improve slip lane geometry, raised crosswalk.

• EXPOSITION BLVD / HILLVIEW RD / WESTOVER RD: Adjust signal timing to provide. protected left turns, install four curb ramps, install/update pedestrian push buttons.


HIGHLAND PARK ELEMENTARY

• FAIRVIEW DR / HANCOCK DR: Install two curb ramps, install high visibility crosswalk, install rapid rectangular flashing beacon (RRFB).

• HANCOCK DR: Construct new sidewalk on Hancock Dr. from Balcones Dr. to Valley Oak Dr.


HILL ELEMENTARY

• TALLWOOD DR: Construct new sidewalk on Tallwood Dr. from Austin Woods Dr. to Hyridge Dr.

• HYRIDGE DR: Construct new sidewalk on Hyridge Dr. from Mesa Dr. to Tallwood Dr.

• AUSTIN WOODS DR / TALLWOOD DR: Add curb extensions; install two curb ramps.


O. HENRY MIDDLE SCHOOL

• NORWALK LN: Construct new sidewalk on Norwalk Ln. from Marlton Dr. to W 12th St.

• ENFIELD RD / EXPOSITION BLVD: Add leading pedestrian interval, repaint crosswalk markings.

• W 12TH ST: Construct new sidewalk on W 12th St. from Possum Trot to Norwalk Ln.

• NORWALK LN / W 12TH ST: Install one curb ramp, install high visibility crosswalk.